Category: Latest News

NHAI has entrusted Voyants with the responsibility of Authority Engineer for Memmadpur (Ambala) – Banur (IT City Chowk) – Kharar (Chandigarh) Corridor under Bharatmala Pariyojana – Package-II

Posted by Voyants | September 15, 2021

Consultancy Services for Authority Engineer for Supervision of Development of Memmadpur (Ambala) – Banur (IT City Chowk) – Kharar (Chandigarh) Corridor under Bharatmala Pariyojana – Package-II – 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length: 31.23 Km) in the state of Punjab on EPC mode.

Posted in Latest News

Andhra Pradesh Maritime Board has entrusted Voyants for preparation of Maritime Master Plan and Maritime Vision Document for Maritime Development and Port led Development initiatives in Andhra Pradesh.

Posted by Voyants | September 14, 2021

Andhra Pradesh Maritime Board has entrusted Voyants for preparation of Maritime Master Plan and Maritime Vision Document for Maritime Development and Port led Development initiatives in Andhra Pradesh including development of entire landside and maritime development.

Posted in Latest News

PWD, West Bengal has mandated Voyants to provide supervision for “Barasat – Basirhat-Road (SH-2) under Barasat Division, PWD in the district of North 24 Parganas, West Bengal under CRIF

Posted by Voyants | September 7, 2021

Consultancy services for the work of “Barasat-Basirhat-Road (SH-2) from 20.00 kmp. To 40.00 kmp – Strengthening work under Barasat Division, PWD in the district of North 24 Parganas, West Bengal under CRIF during the year 2020-21. Length – 20 km, 2 Lane.

Posted in Latest News

KINFRA has awarded Voyants the consultancy services for Obtaining NBWL Permission/NOC for Development of Petro-Chemical Park in Kochi, Kerala

Posted by Voyants | August 25, 2021

Kerala Industrial Infrastructure Development Corporation (KINFRA) has entrusted Voyants to obtain permission of the National Board for Wildlife (NBWL) under the Wildlife (Protection) Act, 1972 for the establishment of Petro-Chemical Park in Kochi, Kerala. Voyants shall undertake all the prerequisite studies to undertake the NBWL Permission for Mangalavanam Bird Sanctuary which is located at a distance of about 9.5 km from the proposed Petro-chemical Park in Kochi.

Posted in Latest News

Hamdard has selected Voyants for providing consultancy services for Environment Site Assessment (ESA) Phase-I and Topographic Survey for 7.5 Acres of Land Parcel in Jhangola, New Delhi

Posted by Voyants | July 31, 2021

Hamdard, an Indian origin Unani pharmaceutical Company has assigned Voyants to undertake Phase-I Environment Site Assessment (ESA) and Topographic Survey for 7.5 Acres of Land Parcel in Jhangola, New Delhi in accordance to the standards of American Society for Testing and Materials (ASTM).

Posted in Latest News

Land Ports Authority of India has awarded the work of preparation of DPR/DER, Architectural Design, Master Plan & Engineering Services for ICP Bhittamore on Indo-Nepal Border

Posted by Voyants | July 28, 2021

Voyants has been engaged by Land Ports Authority of India (LPAI) to provide Master Planning, Architectural Design & Engineering Consultancy, Tendering & Design support during execution for its Integrated Check-Post (ICP) at Bhittamore, Indo-Nepal Border in order to boost the Indo-Nepal Border Trade. The project will be spread on site area of 23 acre for ICP and additional area of 3.5 acres for Accommodation. The key facilities include Passenger Terminal Building, Cargo Terminal Building, Warehouses, Inspection sheds, Quarantine building and Accommodation. This will facilitate the systematic, seamless and secure cross-border movement of goods and people by ensuring efficient passenger flow, providing adequate passenger facilities, smoothening processes, optimizing the use of facilities, systemizing support facilities, and improving traffic flow.

The project duration is 24 months.

Posted in Latest News

Vishakhapatnam Port Trust has engaged Voyants for making TEFR for Development and Mechanization of Existing EQ-6 berth in the inner Harbour of VPT

Posted by Voyants | July 19, 2021

With an objective of port modernization and upgradation to handle cargo in an efficient, quick and environment friendly manner, Visakhapatnam Port Trust (VPT) intends to prepare a Techno Economic Feasibility Report (TEFR) for “Development and Mechanization of Existing EQ-6 berth in the inner Harbour for handling clean cargoes on Design, build, Finance, Operate and Transfer Basis (DBFOT) through Private Sector Participation”.

Posted in Latest News

RUMSL has selected Voyants to provide the Consultancy Services for ESIA for Floating Solar PV Project and its auxiliary structures for a capacity of 600 MW in Madhya Pradesh, India.

Posted by Voyants | July 9, 2021

Voyants has been entrusted by RUMSL to undertake Environmental and Social Impact Assessment for the planned 600 MW Floating Solar PV Project and its auxiliary structures (including floating/marine structures, transmission infrastructure, etc.). The Project comprise six units of 100 MW each of floating solar photovoltaic grid connected power projects to be developed at Omkareshwar Dam Reservoir in Khandwa District, MP.

Posted in Latest News

Rewa Ultra Mega Solar Limited (RUMS)has mandated Voyants for conducting Environmental and Social Baseline for Solar Park Development in Madhya Pradesh – a IBRD funded Project

Posted by Voyants | July 9, 2021

Rewa Ultra Mega Solar Limited (RUMS) has been allocated grant funds from the Clean Technology Fund which are administered by the International Bank for Reconstruction and Development (IBRD). RUMS has further entrusted Voyants for undertaking Environmental and Social Baseline for Solar Park Development in Cluster 1-Morena (1400 MW) and Cluster-2 -Chhatarpur (1000 MW).

Posted in Latest News

NHAI has entrusted Voyants with the responsibility of Authority Engineer for Ujjain – Jhalawar highway in Madhya Pradesh

Posted by Voyants | June 25, 2021

NHAI has appointed Voyants as Authority Engineer for Supervision of 2-lane with Paved shoulder of Ujjain – Jhalawar (upto Rajasthan Border) from km 000+000 to km 132+955 (133.575 km) section of NH-552G in the state of Madhya Pradesh on EPC Basis.” Length – 133.575 km

Posted in Latest News

Copyright © 2020 Voyants Solutions Pvt Ltd.

All rights reserved.